So the next phase of the deck is to put some solid foundations in place. After getting out some string and squaring everything up to the house, Brian and I rented a two-man Auger to drill 32" holes for our post bases. I don't really have any pictures of the holes, but here is the finished product with the concrete poured.

After getting the post holes dug and filling them with concrete, we attached to houseboard by using a hammer drill to drill 10" holes into the house. According to the inspectors, I couldn't just put lag screws into the board behind the brick, I had to go into the ends of the joists (dead-nuts so to speak). It was a pain in the butt, but we finally got all our holes lined up with the end of the joists and attached the board to the house with 10" Lag Screws.




Next step, putting up the massive 6x6 posts after we notch them for the beams.